Phase
1Substructure installation. The substructure is mounted with the Av_pro system. Short anchor keys have to be inserted in the places where the cladding elements will be placed.
Phase
2Profile insertion in the plate. The aluminum profiles are inserted in the carving (kerf) on the plates in a “dry” way.
Phase
3Plate positioning. The plates with the inserted profiles are placed on the lower anchor keys.